Frequently Asked Questions
Below you will find information that might help you understand how to find things or learn about information you might need to know about your city or town.
Building
14-
Building
Mass State Building Code (780 CMR) section 105.1 states that it shall be unlawful to construct, reconstruct, alter, repair, remove or demolish a building or structure; or to change the use and occupancy of a building or structure; or to install or alter any equipment for which provision is made or the installation of which is regulated by the code without first filing an application with the building official and obtaining the required permit. This regulated work includes, but is not limited to, the following:
- New construction, renovations, additions, alterations
- Fire alarms and/or sprinkler systems
- Mechanical systems
- Roofing, siding, replacement windows
- Fireplaces, wood stoves, coal stoves, pellet stoves
- Swimming pools, pool decks
- Accessory structures over 200 square feet
- Any size structure requires approval from the Planning Department (440-711)
- Window awnings which project more than 54 inches
- Retaining walls which hold more than 4 feet of unbalanced fill
- Fences
- Up to 7' in height do not require a Building Permit
- Over 7' in height requires a Building Permit and compliance with zoning setbacks
- Corner lots must comply with city zoning requirements (440-703)
- Compliance with property maintenance requirements maintain that a fence cannot restrict view to oncoming traffic and must be maintained properly (350-3)(350-4)
- Temporary structures, signs, banners
Mass State Plumbing/Gas Code (248 CMR) and Massachusetts General Law Chapter 142:
States only lawfully licensed businesses or individuals may perform Plumbing/Gas fitting work regulated by the Board of Plumber's and Gasfitters. Until a permit has been issued by the Plumbing and Gas Inspector, Plumbing or Gas fitting work shall not be installed, altered, removed, replaced, or repaired. Any application to such permit shall be made in writing to the Inspector before work commences. This code includes, but not limited to Minimum Sanitary requirements for Building Occupancy, point of use protection for all sewer, water and Gas connections within jurisdiction.
In accordance with 527 CMR 12 as well as Massachusetts General Law Chapter 143 section 3L anyone performing electrical work must first, or within five days, deliver an electrical permit application to the local inspector.
In accordance with 271 CMR section 9.02 an application to perform sheet metal work is required to be made to the inspector prior to any erection, installation, or dismantling of sheet metal work. Minor repairs, testing, adjustment, and air-balancing shall not require a permit.
-
Building
Yes, anyone opening a new business and/or changing tenants in an existing or new commercial space must apply to the Building Department for a Certificate of Use and Occupancy as well as a Sign Permit for new business signage. Upon inspection by the Building Commissioner; you will obtain your Certification of Occupancy.
-
Building
If there are no zoning considerations or issues relating to the work being done, notification of abutter is not required. If you would like to know what your neighbors are building, all building permit files are public record and can be viewed at the Building Department by request.
-
Building
You may request an amendment to your existing permit if there have not been any inspections conucted on the project yet.
If you need to change or revise your plans after your permit has been issued, you must file a written amendment request with the revised plans and valuation of the additional work as well as pay any additional fees due.
-
Building
Homeowners should contact a registered home inspector for home inspections, the building inspector is not responsible for independent home inspections.
-
Building
A permit is not required for a fence 6 feet and under in height. Common Practice / Courtesy is to put the "good" side to your neighbor but is not mandatory.
-
Building
uilding permits are issued to Construction Supervisors licensed by the State of Massachusetts. Please note that there are several Specialty Licenses also. The Mass license is only valid for work involving structures less than 35,000 cf, for one & two family dwellings. As an exception to this requirement, building permits are also issued to homeowners doing work on one and two family dwellings where they reside. It is noted that when homeowners are issued building permits, they are liable for contractors working on their property and they are not eligible for protection under the provisions of the Home Improvement Contractor Law. The Seekonk Building Department encourages homeowners to have the building permit taken out by a licensed contractor. Licensed Contractors and Home Improvement Registrations can be checked online on the Home Improvement Contractor Registration and Renewal website.
-
Building
Your building permit is good for 6 months (180 days). Work must commence within that period and continue without interruption, however it may, with permission of the Building Department, be renewed for up to 6 months provided that the request to extend the permit is made prior to original exipration date. After that, if you have not started or continuously worked on the project, your permit will be considered abandoned and you will have to reapply.
-
Building
If your permit was issued in hard copy or prior to January 27, 2020, please call the Building Department Office at 508-336-2990 or email the Building Office and provide the permit type, permit number, address and type of inspection you would like to request as well as your contact information. The inspection request will be relayed to the appropriate inspector for coordination of the visit.
-
Building
When there is any structural work and/or repairs to an existing dwelling; permits are required for including but not limited to the following:
- Siding, Roofing and Windows, all repairs to exterior existing dwellings (with the exception of paint and gutters)
- Additions
- Interior Renovations (no permit required for painting)
- Demolition or moving a structure
- Insulation
- Solar Panels (Building and Electrical permits required)
- Tents 120 square feet and over
- Please also contact Fire Department
- Residential Sheds 200 square feet or over do require a permit (Residential Sheds under 200 square feet do not need a permit but must follow proper Zoning setbacks)
- Signs (Permanent and Temporary)
- Fence over 6 feet
- Change of use / Change of Occupancy / Change of Tenant (Commercial)
- Above and In-ground Pools (Building and Electrical permits required)
- Decks and Porches
- New Dwelling and / or Modular Homes
- Pellet / Wood / Coal Stoves / Fireplace Inserts / Direct Vent / A/C
- Replacements of Kitchen / Bath appliances (MA licensed person only)
- Plumbing, Gas, Electrical and Mechanical work (pulled by MA licensed contractor only)
If you are not sure if your work will require a permit please, contact the office at: 508-336-2990
-
Building
Building permits provide the means for building officials to protect us by reducing the potential hazards of unsafe construction and therefore ensuring the public health, safety, and welfare.
-
Building
Yes, if access to the new work requires an inspector to walk through your existing, furnished house. Someone must be present to let the inspector in. The inspector will not enter an unoccupied furnished house. We also will not enter a house in which only a child is home, unaccompanied by an adult.
-
Building
Most public libraries have a copy. You can view and download chapters of the Massachusetts State Building Code 780 CMR by visiting the Massachusetts Department of Public Safety website.
-
Building
To look up the list of what is kind of license is required for a specific job, visit the Construction Supervisor Licensing website.